Greenbushes - Blackwood Road Drainage Plan

Project Overview

Undertake detailed design engineering to resolve localised flooding issues along Blackwood Road in Greenbushes

Funding Partner

Talison Lithium

Completion Status

10%

Last Month

·         Consultant engagement

·         Stormwater catchment study

Planned action for next month

·         Draft detailed design

·         Final detailed design

Completion

·         August/September 2024

Greenbushes - Jephson Street Streetscape Plan

Project Overview

Undertake catchment study followed by concept landscape designs for the Jephson Street median isle.

This will be followed by community consultation to ensure the needs and wishes of the community are met.

Funding Partner

Talison Lithium

Completion Status

24%

Last Month

·         Consultant engagement

·         Stormwater catchment study

Planned action for next month

·         WSUD concept designs

Completion

·         August/September 2024

Greenbushes - Roads Board Toilets

Project Overview

Refurbish the Roads Board toilets whilst making them accessible and compliant.

Funding Partner

Talison Lithium

Completion Status

24%

Last Month

·        Designs produced by building designer ready for construction

·        Design review by in house artist

·        Develop specifications 

Planned action for next month

·        Engage trades 

Completion

·        September/October 2024

Greenbushes Youth Precinct Stage 2 - Pump Track

Project Overview

Installation of a new pump track and completion of surrounding landscape

Funding Partner

Talison Lithium

Completion Status

75-100%

Last Month

·         Complete Pump Track construction

·         Complete Landscape design

·         Install concrete kerbing

·         Install irrigation

·         Install turf

·         Install mulch

Planned action for next month

·         Install planting (community planting day)

Completion

·         August 2024

Greenbushes - Footpaths

Project Overview

Reconstruction of severely degraded footpaths throughout Greenbushes using several methods to overcome damage by tree roots.

Funding Partner

Talison Lithium

Completion Status

24%

Last Month

·         Review of Concept

·         Award Detailed Design for footpaths requiring major interventions

·         Commenced detailed design work

Planned action for next month

·         Receive draft General Arrangements Plan and Materials Schedule

Completion

·         End September 2024 followed by construction tender

Greenbushes - Roads

Project Overview

Asphalting Woodward at rear of Stinton Gardens,

Asphalting of George St 150m to Tourmaline

Asphalting of Diorite to Galena

Widen Cul-de-sac head on Diorite

Funding Partner

Talison Lithium

Completion Status

0%

Last Month

·         Nil

Planned action for next month

·         Develop roadworks RFQ

Completion

·         End September 2024 pending weather

Greenbushes - Kerbs

Project Overview

Installation of approx. 1km of kerbing within the Greenbushes local roads

Funding Partner

Talison Lithium

Completion Status

0%

Last Month

·         Nil

Planned action for next month

·         Develop roadworks RFQ

Completion

·         End September 2024 pending weather

Greenbushes Hard Courts

Project Overview

Repairs and resurfacing of the Greenbushes Hard Courts

Funding Partner

Talison Lithium

Completion Status

10%

Last Month

·         Developed resurfacing RFQ

·         Issue resurfacing RFQ

·         Award resurfacing contract

Planned action for next month

·         Nil - Works will take place in October/November as surfacing product                  requires warmer weather to set

Completion

·         November 2024

Bridgetown Energy Sustainability

Project Overview

Installation of solar and batteries to the Bridgetown Rec Centre, Library and Civic Centre with energy cost saving going into a sustainability reserve fund.

Funding Partner

Talison Lithium & Department of Sport & Recreation

   

Completion Status

10%

Last Month

·         Completed detailed new energy audit

·         Engaged specialist renewable energy engineer

·         Develop construction tenders

Planned action for next month

·         Issue tenders

Completion

·         December 2024 followed by Western Power approvals

Bridgetown Visitor Centre

Project Overview

Completion of the fit out and landscaping to the Bridgetown Train Station – New Visitor Centre, making it a modern, accessible multi purpose facility.

Funding Partner

Shire and Talison Lithium

 

Completion Status

75%

Last Month

·         Installation of cupboards, desks, audio, electrical, comms, furniture,                  fencing, bins and planter boxes

·         Opening of the new Visitor Centre

Planned action for next month

·         Installation of connecting pathways, ACROD bays and planting

Completion

·         August 2024

Bridgetown Town Hall including AC & AV

Project Overview

Addition of Air Conditioning, screen and projector to the Town Hall Project, ensuring it will become an all weather and all seasons venue for culture and the arts.

Funding Partners

Shire, Talison Lithium, Lotterywest and WA Recovery

  

Completion Status

75%

Last Month

·         Issue Air Conditioning Tender

·         Award of Tender

·         Install roof access

·         Commence internal AC fit-out

·         Order major AC components

·         Western Power upgrade

·         Installation of new site main switchboard

·         New electrical cable runs

·         Commence ceiling fit-off

Planned action for next month

·         Roof repairs and platform to allow for condenser installation

·         Ceiling installation

·         Electrical changeover

Completion

·         November 2024

Greenbushes Railway Station Relocation

Project Overview

Relocation of the Greenbushes Railway Station to the rear of the Greenbushes Discovery Centre. The project includes roof replacement and repairs to the building ready for fit out by the Discovery Centre.

Funding Partners

Shire, Talison Lithium, Lotterywest and WA Recovery

  

Completion Status

75%

Last Month

·         New roof sheeting installed

·         Flooring repairs

·         Carpentry works

Planned action for next month

·         Offsite window and door construction

·         Stone retaining

·         Pathways

Completion

·         August 2024 handover to Discovery Centre

Greenbushes Volunteer Bush Fire Station

Project Overview

Construction of a new fit for purpose fire station on Collins Street Greenbushes

Funding Partners

Shire and DFES

 

Completion Status

49%

Last Month

·         Plumbing pre-lay

·         Concrete slabs and footings

·         Steel roof frames installed

·         Roof and sheeting installed

Planned action for next month

·         Internal fit-out

Completion

·         November 2024

Wandillup Volunteer Bush Fire Station

Project Overview

Construction of a new fit for purpose fire station on the corner of Brockman Hwy and Mokerdillup Road 

Funding Partners

Shire and DFES

 

Completion Status

49%

Last Month

·         Plumbing pre-lay

·         Concrete slabs and footings

·         Steel roof frames installed

·         Roof and sheeting installed

Planned action for next month

·         Internal fit-out

Completion

·         November 2024

Greenbushes Camp Kitchen

Project Overview

Construction of a Camp Kitchen including large shelter with lighting, double bbq, picnic settings and drink fountain at the sportsground campground

Funding Partners

Department of Jobs, Tourism, Science and Innovation - Native Forest Transition  

Completion Status

100%

Last Month

·         Electrical and water pre-lays

·         Concrete slabs and footings

·         Seating wall

·         Shelter installation

·         BBQ, picnic settings and drink fountain installation

Planned action for next month

·         Site tidy

Completion

·         August 2024